Can I enquire without a complete water report?
Yes. Tell us the source, intended use and the information you have. Mark unknown values clearly. A final equipment proposal may need additional analysis.
Does the listed equipment include installation?
Installation, civil works, site utilities, training and commissioning need to be specified in the quotation. Do not assume they are included from a catalog image.
Can I request an OEM or distribution proposal?
Yes. Select the engineering / distributor option and include your market, project role and documentation requirements. Commercial terms are agreed separately.
How do I send a water report or drawings?
Start with the project enquiry. Your contact can arrange the existing CRM attachment workflow during follow-up. Do not include sensitive files in public links.
How is the final equipment selected?
Selection follows the water conditions, required output, operating schedule and site constraints. The website provides preparation guidance, not an automatic engineering approval.