BOKAWATER · Specialist series02 / RO water systems
BOKAWATERRO water systems
RO water systems

RO systems, from standard units to containerized plants.

Compare BOKAWATER standard 2000 L/h, industrial 3000 L/h and containerized 6000 L/h RO equipment. Select by product-water demand, feed-water conditions and installation format.

ENBOKAWATER02 / 04
Equipment reference from BOKAWATER02
Containerized and integrated RO equipment
Reference equipment · configuration subject to project review
BOKAWATER / 02

Product series

Compare the range ↗
2000 L/h RO system for bottling projects
Standard RO

2000 L/h RO system for bottling projects

BOKA-A-RO-2000 · 2000 L/h

A standard RO water treatment unit listed for bottle filling projects. Coordinate its catalog output with the filling schedule, treated-water buffer tank and final sanitation stages to define the complete water preparation scope.

View product ↗
3000 L/h industrial RO system
Industrial RO

3000 L/h industrial RO system

BK-3000RO · 3000 L/h

A 3000 L/h catalog RO system for industrial water preparation. Define the process-water specification first, then review pretreatment, membrane duty and any polishing required by the downstream process.

View product ↗
6000 L/h containerized RO system
Containerized & OEM

6000 L/h containerized RO system

BK-38 · 6000 L/h

A containerized RO package with catalog output of 6000 L/h. The product brings treatment stages into a transportable enclosure, with the final supply defined around feed water, site connections and service access.

View product ↗
BOKAWATER

From first brief to a defined scope

01

Review the feed-water report

Feed-water source, analysis and temperature range

02

Define the product-water target

Required product flow and hours of operation

03

Compare equipment integration

Product-water use and quality requirements

04

Confirm delivery interfaces

Electrical supply, footprint and reject-water route

Bring us the conditions. Let’s define the system.

A useful enquiry can start before every parameter is known. Tell us what you know and where engineering input is needed.

Discuss your project
Product reference assistant