A request for a box of RO filter cartridges is incomplete without the installed assembly and approved service conditions. For an enquiry referencing BOKAWATER BK-3000RO, request the order-specific filter schedule rather than inferring it from the equipment name. This guide concerns pre-RO cartridge consumables, not replacement RO membrane elements, and does not declare any third-party cartridge compatible.

1. Make the spare-parts line identify a complete serviceable item

Assign a tag to the filter housing and record its manufacturer, model, drawing revision and cartridge quantity. Ask for the exact installed part number and a dimensioned interface record: effective length, diameter, end arrangement, adaptor, support and sealing surfaces. Include the gasket or O-ring material and any separate kit. A photograph is useful evidence but should accompany, not replace, the supplier's documented part identification.

Parker's example sheet separates dimensions, fittings and seals. Use that distinction to request your own bill of materials; its options do not prove what BOKAWATER supplies. Have the supplier review actual water chemistry, temperature, dosing and any approved cleaning exposure against the proposed media, structural components and seals. Require written review of substitutions before ordering, even where a cartridge appears to fit.

2. Specify a filtration duty instead of a micron label alone

Pall explains why a filter rating needs its test basis. Ask whether the offered grade is nominal or absolute, what retention claim and method accompany it, and the conditions to which that claim applies. Do not translate one supplier's label into another supplier's efficiency. The RO designer should confirm the required protection and the selected grade for the actual pretreatment train.

Request a sizing record showing the flow through this housing, cartridges in service and the predicted clean pressure loss under the stated conditions. Keep RO permeate output separate from flow through the upstream filter. Identify the pressure instruments and the approved limits of the complete assembly. A component strength rating is not, by itself, the operator's replacement trigger or a permitted system pressure.

3. Turn each replacement into an operating record

FilmTec guidance discusses pressure monitoring and cartridge bypass risks. Obtain a site procedure defining warning, changeout and investigation criteria from the actual suppliers. As arithmetic only, simultaneous upstream and downstream readings of 2.6 and 2.3 bar give 0.3 bar differential pressure. This is not a recommended trigger. Record flow, temperature, instrument tags and operating state with the reading so changes are interpretable.

At replacement, retain date, reason, part and batch identity, service time, recorded pressures and the observed cartridge condition. Assign responsibility for safe isolation, inspection of the housing and seals, reassembly and return-to-service checks under the approved manual. If service life shortens sharply or downstream condition worsens, request an upstream and assembly review rather than simply accepting repeated consumption. Keep startup stock separate from normal operating stock; agree quantities and reorder arrangements using actual demand and confirmed delivery information, without promising a universal life or stocking period.

Data to collect before comparing proposals

Parameter / interfaceUnit / formatWhy it matters
Purchasing recordInformation to retainDecision enabled
Assembly identityHousing tag, model, drawing and cartridge countIdentify the installed boundary
Replacement itemPart number, dimensions, end fitting and adaptorsReview the complete interface
MaterialsMedia, support, seals and actual exposureObtain written suitability review
Filter ratingMicron grade, rating type, test basis and retention claimAvoid unsupported label equivalence
Hydraulic dutyHousing flow, cartridge count and clean pressure lossCheck sizing at the stated condition
MonitoringInstrument tags, pressures, flow and temperatureInterpret a comparable differential
Service criteriaApproved warnings, changeout and investigation rulesSeparate operating action from component strength
Replacement historyDate, reason, batch, observations and release checkTrace changes and recurring problems
Stock planningStartup quantity, operating reserve and reorder ownerBase replenishment on actual service demand

Technical references

  • DuPont — FilmTec Technical Manual, 45-D01504-en, Version 20, August 2026 ↗
    Source checked:
    Evidence scope — original English record

    Sections 2.5.7 and 8.5.3(a): cartridge protection, differential-pressure observation and bypass risks. FilmTec-specific micron, replacement-time and operating limits are not transferred to BOKAWATER. The purchasing worksheet is original project guidance, not a supplied configuration or operating instruction.

  • Pall — Principles of Filtration, WER 5300 ↗
    Source checked:
    Evidence scope — original English record

    Filter-rating discussion, printed pages 7–10: a micron label needs its rating and test basis. No universal nominal/absolute conversion or removal percentage is adopted.

  • Parker — Polyflow Absolute-Rated Filter Cartridge Data Sheet, 2025 Rev. A ↗
    Source checked:
    Evidence scope — original English record

    Example of separate ordering fields for length, end fitting and seals, and conditional differential-pressure limits. No Parker part, rating, certification or compatibility is claimed for a BOKAWATER package.

  • BOKAWATER — Advanced Industrial RO System, item BK-3000RO ↗
    Source checked:
    Evidence scope — original English record

    Existing equipment item identity only. The public listing does not establish the installed cartridge, housing, seal material, spare quantity or approved changeout criterion for a particular order.

Continue your project

Download project data sheet (CSV) ↓Equipment ↗Selection guide ↗

Bring us the conditions. Let’s define the system.

A useful enquiry can start before every parameter is known. Tell us what you know and where engineering input is needed.

Discuss your project
Product reference assistant