BOKAWATER · Specialist series02 / RO water systems
BOKAWATERRO water systems
RO water systems

Water bottling projects

The RO unit is one part of a bottling project. Separate water treatment, treated-water storage, final disinfection and filling-line responsibilities. Provide the filling schedule and finished-water specification, then confirm interfaces with the line supplier. RO treatment alone is not a complete assurance of drinking-water compliance.

BOKAWATER / 02

Product series

Compare the range ↗
2000 L/h RO system for bottling projects
Standard RO

2000 L/h RO system for bottling projects

BOKA-A-RO-2000 · 2000 L/h

A standard RO water treatment unit listed for bottle filling projects. Coordinate its catalog output with the filling schedule, treated-water buffer tank and final sanitation stages to define the complete water preparation scope.

View product ↗
3000 L/h industrial RO system
Industrial RO

3000 L/h industrial RO system

BK-3000RO · 3000 L/h

A 3000 L/h catalog RO system for industrial water preparation. Define the process-water specification first, then review pretreatment, membrane duty and any polishing required by the downstream process.

View product ↗
6000 L/h containerized RO system
Containerized & OEM

6000 L/h containerized RO system

BK-38 · 6000 L/h

A containerized RO package with catalog output of 6000 L/h. The product brings treatment stages into a transportable enclosure, with the final supply defined around feed water, site connections and service access.

View product ↗

Questions worth settling early

  • Filling schedule and buffer storage
  • Finished-water specification
  • Sanitation and line-supplier interfaces

What to prepare

  • Feed-water source, analysis and temperature range
  • Required product flow and hours of operation
  • Product-water use and quality requirements
  • Electrical supply, footprint and reject-water route

Make the scope explicit

Ask the proposal to distinguish equipment supply, civil works, external piping, electrical connections, commissioning, training and consumables. Confirm each responsibility in the project quotation. Items discussed on this website are planning considerations, not an automatic inclusion in every supply package.

TDS alone does not describe scaling, fouling or the pretreatment required.
Discuss your project ↗

Bring us the conditions. Let’s define the system.

A useful enquiry can start before every parameter is known. Tell us what you know and where engineering input is needed.

Discuss your project
Product reference assistant